Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 29, 2023     Empennage fairing - (0.6 hour)       Category: Tail Feathers
1. Sanded the fairing end plugs, and fit the fairing onto the airplane. It fits well. There are still some small ripples I might have to take care of on the right side, and some slight sanding required at the top of the left plug.
2. Applied some straight resin to the areas of the foam plugs that were covered by the clamps, and also ran a strip of resin along the interface surface of the fairing and the fuselage, just for some wear-protection.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.